Which Circuits Will Stay On?
Start with a short list of what you need during a power cut. Refrigeration, a router, lighting, and a fan may be enough for one household. Another may need a water pump, heating controls, or a home office.
Ask for that list to be matched to the backed-up circuits in the installation design. It should be clear which outlets you can use and which large appliances require load management. Have the installer confirm the switching and isolation equipment needed for the proposed system. Critical-load circuits and grid isolation are also discussed in the Pacific Northwest National Laboratory’s backup storage guide. Read the system design guidance.
A Small Load List Can Still Include a Large Peak
Take a hypothetical system with 3 kW of continuous AC backup output. Assume the battery can support that output under the operating conditions. The following appliances draw 250 W when they are all running at the example power levels.
| Appliance | Assumed running power |
|---|---|
| Refrigerator | 150 W |
| Router | 20 W |
| LED lighting | 30 W |
| Fan | 50 W |
| Combined running load | 250 W |
If a 2,000 W kettle is connected to a backed-up outlet and switched on, the running total rises to 2,250 W. Add a 1,500 W heater at the same time and it reaches 3,750 W, above the example system’s continuous rating. Check motor startup demand separately, including the refrigerator and any pumps.
Energy use raises a different question. A 2 kW appliance operated for ten minutes uses about 0.33 kWh. A small load left on all night can use more energy overall. For estimates at different average loads, see How Long Will a 5 kWh or 10 kWh Home Battery Last?.
Check What Happens During Changeover
Ask the supplier for the documented transfer behavior of the exact inverter and backup configuration. Confirm whether changeover is automatic and whether sensitive equipment may restart during the transition. If uninterrupted operation is required, have the installer assess the complete power path against that requirement.
The battery and inverter also need to work together through low-charge conditions, load changes, and recovery. Record the exact model and firmware versions when requesting a review. Our battery–inverter compatibility guide covers those details.
Can Solar Recharge the Battery While the Grid Is Down?
This depends on the installed equipment and backup configuration. In some systems, the solar inverter shuts down during an outage while the battery continues supplying selected loads. Other systems can keep solar generation operating on the isolated backup network. Confirm this behavior for the proposed installation. See the two backup arrangements.
There is one further question for a long outage. If the battery reaches its shutdown limit overnight, can the system restart and begin charging from solar the next morning while the grid is still unavailable? Ask the installer to confirm the supported recovery procedure and any minimum battery charge required. This recovery capability is often described as black start. See the black-start discussion.
Once the backup arrangement is clear, use the home backup battery sizing guide to estimate the energy needed for your selected loads and target outage duration.
For an outage lasting more than one day, also work out how much charge you can recover between discharge periods. The home battery charging time guide uses a solar-surplus example to explain that calculation.
Send MINGWATT your installation country, existing inverter and solar equipment, the circuits you want to back up, and your target backup time.