How to Size a Retrofit Battery Using Solar Export Data

Size a battery for an existing solar system by comparing the surplus it can capture with the electricity you want to use later. The solar array's kW rating alone cannot give the answer. You also need usable battery energy, charging power, and the timing of household demand.

Download interval import and export records for representative days and seasons. The example below starts with a home that has solar but no battery. All surplus figures are measured on the AC side after daytime household consumption.

Check How Much Export the Charger Can Capture

Suppose an AC-coupled battery system can accept a maximum of 2 kW AC for charging. Assume it has enough empty usable capacity throughout the day and no other charging restrictions.

Illustrative capture limit with a 2 kW AC charging input
PeriodAverage surplusExport energy before storageMaximum AC energy captured
9–11 a.m.: 2 hours0.5 kW1 kWh1 kWh
11 a.m.–1 p.m.: 2 hours3 kW6 kWh4 kWh
1–3 p.m.: 2 hours1 kW2 kWh2 kWh
TotalVaries9 kWh7 kWh

At midday, 3 kW is available but only 2 kW enters the charger. Across two hours, 2 kWh remains uncaptured. Increasing battery capacity alone would not remove this power limit.

For each interval, the initial capture estimate is the smaller of surplus power and allowed charging power, multiplied by interval hours. Then account for remaining battery headroom and the actual controls. Shorter intervals give a better picture of peaks than the broad blocks used here.

Convert Captured Energy Into Evening Supply

Assume 90% of the captured AC energy becomes usable stored DC energy, followed by 90% DC-to-AC conversion when discharging:

7 × 0.90 = 6.3 kWh usable DC added
6.3 × 0.90 = 5.67 kWh AC available later

If the evening load is 6 kWh AC, the example falls short by 0.33 kWh before extra standby consumption. A larger nominal battery would not create the missing energy. A different charging limit, load schedule, or charging source would need assessment.

With a hypothetical 3 kW charger and sufficient headroom, all 9 kWh could instead be captured in this simplified day, providing 7.29 kWh AC at the same efficiencies. Actual power limits may change with temperature and state of charge. These are generic examples, not product specifications.

Keep Nominal Capacity and Empty Headroom Separate

To deliver 6 kWh AC at 90% discharge efficiency requires about 6 ÷ 0.90 = 6.67 kWh usable DC. If a candidate allows 90% of its nominal energy to be used, the arithmetic minimum is about 6.67 ÷ 0.90 = 7.41 kWh nominal, before additional planning allowances.

That calculation addresses energy capacity; it does not prove the system can recharge it on the example day. A battery that starts partly full also has less room for midday surplus. Use the actual available window rather than applying a usable fraction again to an already-usable specification.

The capacity guide explains the terms. The charging-time guide covers the relationship between charging power and time.

Repeat the Calculation for Winter and Occupied Days

Check days with lower generation, higher daytime use, and different evening demand. On a hypothetical day with only 3 kWh of fully captured AC surplus, the same two efficiencies deliver 2.43 kWh AC later. Sizing from one sunny day would hide that difference.

Export data also excludes generation curtailed before reaching the meter. The Australian Government's battery guide discusses curtailed solar and storage. Ask the installer whether the proposed controls can recover any of it; do not add an assumed amount to your measured exports.

Turn the Data Into a Quote Brief

Provide interval records, the existing inverter model, target evening energy, and any backup reserve requirement. Request a simulation that tracks charging limits, state of charge, losses, and remaining grid imports across the same period for each proposed battery.

Compare the AC-coupled and hybrid retrofit routes before settling on equipment. Return to the existing-solar retrofit overview for the installation checklist, or send MINGWATT your data and project requirements for a configuration discussion.