Get the Full Voltage Range from the Vehicle Supplier
Labels such as 48V, 60V, and 72V are starting points for identifying a system class. Obtain the proposed pack’s nominal voltage, maximum charge voltage, and allowed discharge range. Have the vehicle integrator compare them with the controller, charger, display, and any DC-DC converter supplying accessories.
Controller documentation shows why the complete range matters. Kelly Controls lists nominal and operating voltage ranges separately in its controller specifications. Those ranges belong to the listed controllers; request the documentation for the unit fitted to your vehicle.
For a lead-acid replacement, include the original battery arrangement and charger model. Approval of the proposed replacement needs to cover the complete electrical system.
Size Energy Around a Shift
For a generic planning exercise, assume a 60 km shift uses an average of 100 Wh per kilometre at the battery terminals. This is an illustrative consumption figure, not a typical rating for three-wheelers. Replace it with measurements for the intended vehicle, load, and route.
Shift energy = 60 km × 100 Wh/km = 6,000 Wh, or 6 kWh DC
Adding a hypothetical 20% energy allowance gives a target of 6 × 1.20 = 7.2 kWh usable DC. The allowance is added to the route estimate; it is not a recommendation for a battery’s shutdown setting.
Now consider a hypothetical pack rated at 76.8 V and 100 Ah:
| Item | Calculation | Result |
|---|---|---|
| Nominal energy | 76.8 × 100 ÷ 1,000 | 7.68 kWh |
| Usable DC energy at an assumed 90% | 7.68 × 0.90 | 6.912 kWh |
| Target including the planning allowance | 6 × 1.20 | 7.2 kWh |
The candidate covers the assumed 6 kWh shift but falls 0.288 kWh short of the target with allowance. It would need a revised capacity, charging, or route plan to meet that target. Starting charge, cold-weather performance, aging, and operating restrictions also need consideration.
Because the example defines Wh/km at the battery terminals, it already includes the electrical energy used by the drivetrain and included accessories. Applying another drivetrain-efficiency factor would count those losses twice. The battery capacity guide explains the energy units used here.
If you are assessing a replacement pack, compare LiFePO4 and lead-acid three-wheeler batteries against the same route-energy target, then review charging, maintenance, and replacement costs.
Check Battery Current During Acceleration and Climbing
Request the controller’s battery-current limits and the time spent at high load. Motor phase current and battery current are different quantities; Kelly’s controller FAQ discusses that distinction. A motor’s nameplate power alone is not enough to specify the pack current.
For example, if the controller draws 6 kW of DC electrical power while the pack is at 64 V under load, battery current is 6,000 ÷ 64 = 93.75 A. The 64 V point is hypothetical and must be inside the selected system’s permitted range. Sustained climbing requires a continuous rating that covers the actual demand; a brief peak rating needs a stated duration and recovery conditions.
Have the supplier explain how the BMS and vehicle respond when available current falls. Orion’s current-limit documentation describes limits that account for voltage, temperature, and pack condition. Confirm which controls the proposed system actually supports and how they are coordinated.
Include Charging, Fit, and a Vehicle Trial
Specify the charging location, supply, and turnaround time between shifts. Confirm the charger’s voltage profile, current, connector, and control interface. Where regenerative braking is used, have the integrator confirm how returned energy is limited at high charge or restricted battery temperature, and how the vehicle handles reduced regeneration.
Provide a compartment drawing with mounting points, connector access, and the permitted pack mass. State whether the battery is fixed or removable and describe expected vibration, rain, dust, and washing exposure. Ask for evidence relevant to the complete proposed pack and installation.
Before a fleet order, agree a supervised vehicle trial and acceptance criteria with the integrator. Record route energy, loaded performance, charging time, temperatures, alarms, and battery condition after the run. Keep the tested hardware and firmware versions in the purchase specification.
For a MINGWATT fleet or OEM enquiry, send the vehicle model, controller and charger details, loaded route requirements, compartment drawing, destination market, and expected order volume. Request the proposed configuration, relevant test documents, sample plan, warranty, and service arrangements.